Interface Onelines - Eaton IBC-L Installation Manuals

93pm integrated battery cabinet-large and large high rate
Hide thumbs Also See for IBC-L:
Table of Contents

Advertisement

5 5 . . 2 2
I I n n t t e e r r f f a a c c e e O O n n e e l l i i n n e e s s
Figure 38
shows the UPS and 93PM IBC-L or 93PM IBC-LH intercabinet interface connection onelines.
Figure 38. 93PM Integrated Battery Cabinet Interface Oneline
24 Vdc Battery Shunt Trip +
24 Vdc Battery Shunt Trip –
NOTE
24 Vdc Battery Shunt Trip +
24 Vdc Battery Shunt Trip –
Battery Detect Return
NOTE 1
NOTE 2
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
UPS
Customer TB
7
8
Battery Detect
9
Battery Detect Return
10
Battery Detect and DC Shunt Trip wiring should be a minimum of 18 AWG.
UPS
Customer TB
7
8
9
Battery Detect
10
Battery Detect and DC Shunt Trip wiring should be a minimum of 18 AWG.
Four battery cabinets shown. Battery cabinets 5 through 8 are wired the same.
Battery
Cabinet
TB3
24 Vdc
ST
Single Battery Cabinet
Battery
Battery
Cabinet 1
Cabinet 2
(First)
(Middle)
TB3
TB3
24 Vdc
ST
ST
Multiple Battery Cabinets
Onelines and Schematics
Battery
Battery
Cabinet 3
Cabinet 4
(Middle)
(Last)
TB3
TB3
ST
ST
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibc-lh93pm ibc-l93pm ibc-lh

Table of Contents