Power Onelines - Eaton IBC-L Installation Manuals

93pm integrated battery cabinet-large and large high rate
Hide thumbs Also See for IBC-L:
Table of Contents

Advertisement

C C h h a a p p t t e e r r 5 5 O O n n e e l l i i n n e e s s a a n n d d S S c c h h e e m m a a t t i i c c s s
5 5 . . 1 1
P P o o w w e e r r O O n n e e l l i i n n e e s s
Figure 32
power connection onelines.
Large High Rate (IBC-LH) intercabinet power connection onelines.
See paragraph
wiring recommendations.
Figure 32. 93PM IBC-L Line-Up-and-Match Power Oneline
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
through
Figure 34
show the UPS and 93PM Integrated Battery Cabinet-Large (IBC-L) intercabinet
Figure 35
3.2.2 IBC Power Wiring Preparation
Internal
Battery
Breaker
UPS Cabinet
Battery Cabinet 1
NOTE
Battery cabinet wiring assumes using factory supplied wiring and one wire per pole.
through
Figure 37
show the UPS and 93PM Integrated Battery Cabinet-
for wiring installation notes and
Internal
Battery
Breaker
Battery Cabinet 2
Four Battery Cabinets Maximum
Table 5
through
Internal
Internal
Battery
Battery
Breaker
Breaker
Battery Cabinet 3
Battery Cabinet 4
Table 7
for
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibc-lh93pm ibc-l93pm ibc-lh

Table of Contents