Introduction

Figure 2. Eaton 93PM IBC-L or 93PM IBC-LH with Left or Right Mounted Sidecar

1 1 . . 1 1
I I n n s s t t a a l l l l a a t t i i o o n n F F e e a a t t u u r r e e s s
Line-up-and-match configurations using factory supplied power wiring or standalone configurations using
customer supplied power wiring
Battery wiring can be run internally through the left or right sides of the IBCs in line-up-and-match
configurations or routed through the bottom of the IBCs using conduit in standalone configurations
A factory installed sidecar option is available for standalone installations needing top entry wiring.
Only one sidecar is needed for multiple IBCs.
Easily accessible mechanical terminals located at the bottom front of the cabinet reduce installation time.
Interface wiring can be routed through the top left or right sides of the IBCs in line-up-and-match
configurations or through the top or bottom of the IBCs using conduit in standalone configurations.
IBCs with and without a sidecar can be installed in a single lineup.
Built-in casters for easy cabinet placement.
Line-up-and-match battery cabinets are installed adjacent to the UPS. The recommended installation location is
on the right side of the UPS cabinet as viewed from the front of the cabinet. See
configuration views.
2
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
Figure 3
for line-up-and-match

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibc-lh93pm ibc-l93pm ibc-lh

Table of Contents