Line-Up-and-Match Wiring. Route the battery shunt trip interface wiring from the UPS battery shunt trip
interface terminals through the bottom inter-cabinet access pass-through (see
cabinet and IBC to the IBC battery interface terminal block TB2. See
locations. See paragraph
wiring and termination requirements. Refer to the applicable Eaton 93PM UPS Installation and Operation
manual listed in paragraph
3.
Proceed to
4.
Top Entry Wiring. Remove the top conduit plate (see
all conduit requirements and mark their location. Drill and punch all conduit holes in the top conduit plate
prior to mounting on the IBC. Install the conduit plate and install all conduit runs into the plate. Pull the
wiring through the conduit into the wiring area.
NOTE
5.
Route the battery shunt trip interface wiring from the UPS battery shunt trip interface terminals through
the top of the IBC sidecar and the top IBC inter-cabinet wiring access pass-through (see
IBC battery interface terminal block TB3.
6.
Proceed to
7.
Bottom Entry Wiring. Remove the bottom conduit plate (see
IBC. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the
bottom conduit plate prior to mounting on the IBC. Install the conduit plate and install all conduit runs into
the plate. Pull the wiring through the conduit into the wiring areas.
NOTE
8.
Route the battery shunt trip interface wiring from the UPS battery shunt trip interface terminals through
the bottom of the IBC to the IBC battery interface terminal block TB2.
9.
Connect the battery shunt trip interface wiring to the IBC battery shunt trip interface terminals. See
paragraph
For a detailed view of the IBC terminal block, see
10. Connect the battery shunt trip interface wiring to the UPS battery shunt trip interface terminals. Refer to
the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph
1.7 For More
NOTE
11. Reinstall the internal safety shield panel removed in
4.3.1 Line-Up-and-Match Power
12. Close the outside door and secure the latch.
13. If removed, reinstall the sidecar internal safety shield panel and secure with the retained hardware.
14. If removed, reinstall the sidecar front panel and secure with the retained hardware.
15. Once the battery cabinets are installed and wired, return to the applicable Eaton 93PM UPS Installation and
Operation manual, listed in paragraph
58
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
3.2.2 IBC Power Wiring
1.7 For More
Step
9.
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
Step
9.
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
3.2.2 IBC Power Wiring Preparation
Information, for UPS cabinet termination requirements.
In the following step, if the safety shield cannot be reinstalled because of misalignment,
use the leveling feet to realign the cabinet.
Wiring.
Preparation,
Table 10
Information, for UPS cabinet terminal locations.
Figure
25) from the top of the IBC sidecar. Identify
Figure
and
Table 12
for termination requirements.
Figure 30
or
Figure
Step 3
of paragraph
1.7 For More
Information, to complete the UPS wiring.
Figure
Figure
15) of the UPS
Figure 27
or
Figure 28
for terminal
or
Table
11, and
Figure 29
Figure
Figure
15) to the
24) from the inside bottom of the
Figure
31.
15).
for
15).
15).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibc-lh93pm ibc-l93pm ibc-lh

Table of Contents