Eaton IBC-L Installation Manuals page 44

93pm integrated battery cabinet-large and large high rate
Hide thumbs Also See for IBC-L:
Table of Contents

Advertisement

Installation
CABINET MAY FALL. Do not loosen the hardware attaching the front supports to the cabinet base. The cabinet
must be lowered by the jacking bolts before the supports can be removed.
10. Carefully and evenly lower the cabinet by turning each jacking bolt consecutively two full turns
(maximum) until the casters contact the floor and the cabinet is no longer supported by the jacking bolts.
11. After the IBC is resting on the floor, remove the jacking bolts and floor protectors. Recycle them in a
responsible manner.
12. Remove the cabinet support bolts fastening the left, right, front, and rear supports together (see
Figure
13. Remove the cabinet mounting bolts holding the left, right, front, and rear supports to the cabinet base (see
Figure
14. If a sidecar is installed to the IBC, proceed to
15. Remove the bottom screw securing the sidecar front panel. Lift the panel straight up to remove from the
panel hanger brackets at the top of the cabinet.
16. Remove the sidecar support bolts fastening the side support to the front and rear supports.
17. Remove the sidecar mounting bolts holding the front and rear sidecar supports to the cabinet base.
18. Remove the supports. If installing the cabinet permanently, retain the cabinet mounting bolts; otherwise,
recycle the bolts along with the support brackets in a responsible manner.
19. Close the door and secure the latch.
20. If the leveling feet are not retracted, turn all four leveling feet until they are retracted as far into the cabinet
as possible.
NOTE
21. If line-up-and-match installation, remove the rectangular knockout on the bottom front side of the UPS and
the IBC (see
22. The IBC is shipped set up for rear ventilation with a cover plate installed over the ventilation grill on top of
the unit (see
the unit and install the plate over the rear ventilation grill (see
To prevent tipping when rolling the cabinet, push the cabinet from the rear whenever possible.
23. Roll the IBC to the line-up-and-match installation location on the right side of the UPS cabinet making sure
the doors are flush with each other or to the standalone installation location.
NOTE
24. Secure the IBC in position by lowering the leveling feet until the cabinet is level and locked in place.
25. If permanently mounting the IBC, proceed to
26. Locate the two floor mounting brackets from the parts kit.
36
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
14).
14).
The battery cabinet may be located to either the right or left of the UPS cabinet. The
recommended location is to the right of the UPS cabinet. This procedure assumes the
battery cabinet is located to the right of the UPS cabinet.
Figure
15).
Figure
16). If top ventilation is required, remove the screws securing the plate at the top of
Use the leveling feet to level and lock the cabinet in place.
CAUTION
Step
15; otherwise, skip to
Figure
17).
CAUTION
Step
26; otherwise, skip to
Step
18.
Step
29.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibc-lh93pm ibc-l93pm ibc-lh

Table of Contents