6.5 Connecting a StorageWorks Shelf
When installing an additional StorageWorks shelf, connect the power cable to
an AC power strip; connect the signal cable to the SCSI controller at the I/O
bulkhead. See Chapter 1 for cabinet and pedestal configuration guidelines.
Figure 6–6 SCSI Port
PK-0659-96
6-10
Configuration and Installation Guide