Digital Equipment AlphaServer 4000 Configuration And Installation Manual page 93

Hide thumbs Also See for AlphaServer 4000:
Table of Contents

Advertisement

When the system powers up, tests run. Verify that all tests have passed by
checking the results in the test display.
Enter the show device command and then check the output against the physical
SBBs (storage building blocks).
Perform preboot tasks such as setting environment variables and running ECU
(EISA Configuration Utility), RCU (RAID Configuration Utility), and LFU
(Loadable Firmware Update).
Boot the operating system.
NOTE: Check all power cable connections from the system components to the AC
power controllers. Make sure that both AC power controller circuit breakers are
On.
NOTE: Before you power up the system, you may want to connect a printer to the
parallel port (located at the rear of the system drawer) to capture the power-up test
results.
System Power-Up and Verification
7-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alphaserver 4100

Table of Contents