" 23. Wire all necessary power leads to the Drive. DO NOT CONNECT MOTOR TO DRIVE YET.
" 24. Wire all necessary ground wires to the Drive.
" 25. Wire all necessary control wires to the Drive.
" 26. Ensure that the power leads are connected to the R/L1, S/L2 and T/L3 terminals in the Drive.
" 27. Tighten all of the three-phase power and ground connections. Please check that all control and signal terminations are
tight.
" 28. Inspect the control circuit connections (including the shield) and determine if a motor "safety circuit" is connected.
If normally closed, these contacts may be wired in series with the RUN command contacts, which are between
terminals S1 and SN of the Drive. No special programming is required. Refer to Chapter 2 – Electrical Installation
(Fig. 2.7).
Alternately, these contacts could be wired between terminals S3 and SN as External Fault Inputs, and may be either
normally closed or normally open contacts.
" 29. Record any other connections to the Drive using the blank terminal connection drawing in Chapter 2 – Electrical
Installation (Fig. 2.9) to determine if special programming is required for the following:
•Multi-function Inputs – refer to Appendix A – Parameter List
•Multi-function Outputs – refer to Appendix A – Parameter List
•Multi-function Digital Inputs – refer to Appendix A – Parameter List
•Multi-function Analog Outputs – refer to Appendix A – Parameter List
•Serial Communications – refer to Appendix A – Parameter List
THIS COMPLETES THE DRIVE START UP PREPARATION.