Kollmorgen S700 Instruction Manual page 50

Digital servo amplifier sto dual channel
Hide thumbs Also See for S700:
Table of Contents

Advertisement

Technical description
5.9.9.2
SIL CL3 / PLe Dual Channel control
To achieve PLe / SIL CL3, the safe switching of the pulse inhibitor must be tested periodi-
cally by analyzing the feedback signal from a safety control:
l
l
l
The inputs STO1-ENABLE and STO2-ENABLE are switched in turns according to a defi-
ned test sequence. The switching state of the pulse inhibitor is available at a digital output
of the S700 and is analyzed by a safety control.
The test sequence for the functional test of the safe pulse inhibitor must be performed as
shown in the following time chart. Prerequisites for the start of the test sequence:
l
l
l
Legend:
STO1-ENABLE: digital input, 1st switch-off path
STO2-ENABLE: digital input, 2nd switch-off path
STO-STATUS: digital output, switching state of pulse inhibitor
T1 ... T5: Test sequence
Start: Start of test sequence
End: End of test sequence
50
At the start of a system
At the restart after triggering a protective device
At least every 8 hours by the operator.
Operational readiness BTB/RTO = "1"
Enable signal ENABLE = "0"
STO1-ENABLE and STO2-ENABLE = "0"
07/2014
S701x2-S724x2 Instructions Manual
Kollmorgen

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S7060S7240S7030S7120S7010

Table of Contents