Chapter 3 - Commissioning
3.1

Commissioning Steps

After completing the installation process, as described in the preceding chapter,
several actions should be performed to ensure connectivity with a BTS and
provisioning of services. After the CPE is connected with a BTS, it can be fully
managed via the wireless link:
The basic parameters must be configured to ensure that the unit operates
1
correctly and can communicate with a BTS.
The antenna must be aligned to ensure optimal performance of the wireless
2
link.
Proper operation should be verified, including data connectivity.
3
BreezeMAX PRO 5000 CPE
31
Commissioning Steps
Product Manual