Carrier Disassembly - JLG E600 Service And Maintenance Manual

Hide thumbs Also See for E600:
Table of Contents

Advertisement

SECTION 3 - CHASSIS & TURNTABLE

Carrier Disassembly

1. Using a 1/4" punch, drive the Roll Pin (3G) which
holds the Planet Shaft (3E) in the Carrier (3A) down
into the Planet Shaft (3E) until it bottoms.
NOTE: Make sure that the Roll Pin has bottomed. Other-
wise, damage to the carrier could occur when the
Planet Shaft is removed.
2. Remove the Planet Shaft (3E) from the Carrier (3A).
3-38
3. Slide the Planet Gear (3F) and the two Thrust Wash-
4. Remove both rows of Needle Bearings (3C) and the
5. Using a 1/4" punch, drive the Roll Pin (3G) out of the
6. Repeat Steps 1 through 5 for the remaining two
3A. Carrier
3E. Planet Shaft
3B. Thrust Washers
3F. Planet Gear
3C. Needle Bearings
3G. Roll Pin
3D. Spacer
Figure 3-23. Carrier Disassembly
– JLG Lift –
ers (3B) out of the Carrier (3A).
Spacer (3D) from the bore of the Planet Gear (3F).
Planet Shaft (3E).
Planet Gears (3F).
3121813

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E600jM600M600jM600jpE600jp

Table of Contents