AREA
Boom Assembly
Boom Weldments
Hose/Cable Carrier Installations
Pivot Pins and Pin Retainers
Sheaves, Sheave Pins
Bearings
Wear Pads
Covers or Shields
Extend/Retract Chain or Cable Systems
Platform Assembly
Platform
Railing
Gate
Floor
Rotator
Lanyard Anchorage Point
Turntable Assembly
Swing Bearing
Swing Drive System
Turntable Lock
Hood, Hood Props, Hood Latches
Chassis Assembly
Tires
Wheel Nuts/Bolts
Wheel Bearings
Oscillating Axle/Lockout Cylinder Systems
Steer Components
Drive Motors
Drive Hubs
Functions/Controls
Platform Controls
Ground Controls
Function Control Locks, Guards, or Detents
Footswitch
3121813
Table 2-3. Inspection and Preventive Maintenance Schedule
1
Pre-Start
Inspection
9
9
1,2
1,2
1,2
2
9
9
1
1
9
5
5
1,5
1,5
– JLG Lift –
INTERVAL
Weekly
Monthly
Preventive
Preventive
Maintenance
Maintenance
5
9,5
16,17
15
5
5
1,5
SECTION 2 - GENERAL
2
4
Pre-Delivery
Annual
3
(Yearly)
or Frequent
Inspection
Inspection
1,2,4
1,2,4
1,2,9,12
1,2,9,12
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2,3
1,2,3
1,2
1
1,2
1
1,5
1
1,2
15
1,2,10
1,2,10
1,2,14
1,2,3,13,14
11
11
1,2,5
1,2,5
5
1,2,5
16,17,18
16,17,18
15
15
5,8
11
11
6
6
6
6
5
5
5
5
Every 2
Years
14,24
2-7