Output Carrier Disassembly - JLG RT2669 Service And Maintenance Manual

Hide thumbs Also See for RT2669:
Table of Contents

Advertisement

Output Carrier Disassembly

3A. Carrier
4. Planet Gear Sub-Assembly
4A. Output Carrier
4B. Thrust Washers
1. Drive the roll pin (4G) into the planet shaft (4E) until it
bottoms against the carrier (3A) using a 1/8" diame-
ter punch.
2. Using a soft face hammer, tap the planet shaft (4E)
out of the carrier (4A).
3. Drive the roll pin (4G) out of the planet shaft (4E)
using a 1/8" diameter punch.
NOTE: The roll pins (4G) should not be reused when reas-
sembling the unit.
4. Slide the planet gear sub-assembly (4) out of the out-
put carrier (4A) carefully so that the needle bearings
do not drop during the process.
31215923
SECTION 3 - CHASSIS, PLATFORM, & SCISSOR ARMS
4C. Needle Rollers
4D. Thrust Spacer
4E. Planet Shaft
4F. Planet Gears
Figure 3-9. Output Carrier Disassembly
4G. Roll Pin
4H. Thrust Washer
3-31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt3369Rt3669Ert2669Ert3369Ert3669

Table of Contents