Oracle X7-2 Installation Manual page 69

Hide thumbs Also See for X7-2:
Table of Contents

Advertisement

b.
Use your right thumb to pull the connector A release lever to the right, away
from the left slide-rail (callout 1), and use your left hand to pull the connector
out of the slide-rail [frames 1 and 2].
Callout
1
Remove the CMA from the rack and place it on a flat surface.
8.
9.
Go to the front of the server and push it back into the rack.
Related Information
"Install the Cable Management Arm (Optional)" on page 54
Remove the Cable Management Arm
Description
Connector A release lever
Installing the Server Into a Rack
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

X7-2l

Table of Contents