Oracle X7-2 Installation Manual page 63

Hide thumbs Also See for X7-2:
Table of Contents

Advertisement

b.
To pull the green release tabs, place your finger in the center of each tab, not
on the end, and apply pressure as you pull the tab toward the front of the
server.
c.
Continue pushing the server into the rack until the slide-rail locks (on the
front of the server) and engages the slide-rail assemblies.
You hear an audible click when the server is in the normal rack position.
Connect cables to the server, as required.
14.
Instructions for connecting the server cables are provided in
Power" on page
71.
15.
Open the CMA cable covers, route the server cables through the CMA cable
troughs (in the order specified below), close the cable covers, and secure the
cables with the six Velcro straps.
a.
First through the front-most cable trough
b.
Then through the small cable trough
Install the Cable Management Arm (Optional)
"Connecting Cables and Applying
Installing the Server Into a Rack
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

X7-2l

Table of Contents