Before you install the CMAs, ensure that the right-angle AC power cables are long
Note -
enough to connect to the rackmounted servers when routed through the CMAs.
1.
Unpack the CMA, which contains the following components.
Callout
1
2
3
4
5
6
Install the Cable Management Arm (Optional)
Description
Connector A
Front slide bar
Velcro straps (6)
Connector B
Connector C
Connector D
Installing the Server Into a Rack