Index
A
AC power
main, 119
standby, 119
access route and data center checklist, 137
agency compliance, 20
airflow requirements, 17
B
back panel
connections, 32
C
cable connectors
location, 72, 73
cable management arm (CMA)
installing on server, 54
uninstalling, 65
cable ports
location, 72, 73
cabling
required connections, 71
chassis, aligning mounting bracket with, 44
checklist
access route, 137, 137
auto service request, 141
data center environment, 138
facility power, 139
rackmount, 140
safety, 141
circuit breaker and UPS guidelines, 20
clearance, airflow, 17
connectors, location
back panel, 29
front panel, 27
D
data center environment checklist, 138
documentation
Oracle ILOM, 83
E
electrical power requirements, 18
environmental
requirements, 15
ESD precautions, 41
Ethernet ports, 76
cabling, 71
pinouts, 71
external cables, connecting, 72, 73
F
facility power guidelines, 19
first-time log in
Oracle ILOM, 85
G
Gigabit Ethernet connectors, 76
145
Need help?
Do you have a question about the X7-2 and is the answer not in the manual?