Oracle X7-2 Installation Manual page 140

Hide thumbs Also See for X7-2:
Table of Contents

Advertisement

Preparation Checklists
Rackmount Considerations
Is the distance between the front and back mounting
planes between a minimum of 610 mm and a maximum
915 mm (24 inches to 36 inches)?
Is the clearance depth in the front of the front mounting
plane (distance to the front cabinet door) at least 25.4
mm (1 inch)?
Does the target rack meet the following minimum load
capacity:
■ 19 kg/rack unit
■ 785 kg total
Is the rack a four-post rack (mounting at both front and
back)?
Two-post racks are not compatible.
Do the horizontal opening and unit vertical pitch of the
rack conform to ANSI/EIA 310-D-1992 or IEC 60297
standards?
Does the rack have RETMA rail support?
Does the rack support Oracle cable management arms
(CMAs)?
Does the rack support installation of Oracle vented and
solid filler panels?
Is there sufficient space for cable harnesses and the
power distribution units (PDUs) in the rack, if required?
Can a label with the server serial number be printed and
attached to the target rack?
Did you label the network cables that will connect to
the server?
Does the rack support installation of standard Oracle
PDUs?
If not, then complete this checklist.
Can the customer provide an equivalent pair of PDUs?
Can the customer provide two PDUs with capacity of
110kVA per PDU?
Can the customer provide a single PDU and its circuits
to support the power requirements in case a PDU fails?
Can the customer ensure power loads are evenly
distributed across all circuits of a single PDU?
140
Oracle Servers X7-2 and X7-2L Installation Guide • October 2017
Yes
No
N/A
Comment

Advertisement

Table of Contents
loading

This manual is also suitable for:

X7-2l

Table of Contents