Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062
Commissioning manual
Verifying SPA communication........................................................... 98
Verifying IEC communication............................................................ 98
Fibre optic loop....................................................................................... 99
communication.................................................................. 101
Communication via the rear ports ........................................................101
LON communication........................................................................ 101
The LON Protocol............................................................................102
Hardware and software modules..................................................... 102
communication.................................................................. 107
Overview...............................................................................................107
Setting the station communication........................................................107
Verifying the communication.................................................................108
C37.118/1344 communication...........................................109
Overview...............................................................................................109
Setting the TCP/UDP client communication......................................... 111
Verifying the communication.................................................................114
Section 12 Testing IED operation........................................................123
Preparing for test.................................................................................. 123
Requirements.................................................................................. 123
Preparing the IED to verify settings................................................. 125
Activating the test mode....................................................................... 126
Preparing the connection to the test equipment................................... 126
Connecting the test equipment to the IED............................................ 127
Releasing the function to be tested...................................................... 128
Testing the protection functionality....................................................... 130
Forcing of binary input/output signals for testing.................................. 130
Forcing concept............................................................................... 130