Incident Notification - JLG 1230ES Operation And Safety Manual

Vertical mast lift
Table of Contents

Advertisement

SECTION 5 - EMERGENCY PROCEDURES
Figure 5-1. Location of Manual Descent Valve
(Front of Machine)
5-2
5.4

INCIDENT NOTIFICATION

JLG Industries, Inc. must be notified immediately of any incident
involving a JLG product. Even if no injury or property damage is
evident, the factory should be contacted by telephone and pro-
vided with all necessary details.
USA: 877-JLG-SAFE (554-7233)
EUROPE: (44) 1 698 811005
AUSTRALIA: (61) 2 65 811111
E-mail: productsafety@jlg.com
Failure to notify the manufacturer of an incident involving a JLG
Industries product within 48 hours of such an occurrence may
void any warranty consideration on that particular machine.
FOLLOWING ANY ACCIDENT, THOROUGHLY INSPECT THE MACHINE AND TEST
ALL FUNCTIONS FIRST FROM THE GROUND CONTROL STATION, THEN FROM
THE PLATFORM CONTROL CONSOLE. DO NOT ELEVATE PLATFORM UNTIL YOU
ARE SURE THAT ALL DAMAGE HAS BEEN REPAIRED, IF REQUIRED, AND THAT
ALL CONTROLS ARE OPERATING CORRECTLY.
– JLG Lift –
3121221

Advertisement

Table of Contents
loading

Table of Contents