SECTION 4 - MACHINE OPERATION
Lowering Platform
ENSURE THE AREA BENEATH THE PLATFORM IS FREE OF PERSONNEL PRIOR
TO LOWERING.
NOTE: The machine is equipped with a descent alarm which will
sound as the platform is being lowered (optional on CE
units).
4-10
From Ground Control Station
Figure 4-8. Lowering Platform From Ground Control
1. If operating from the ground controls -
Position the lift switch (1) to down and hold until
desired elevation is achieved or until platform is fully
lowered.
DO NOT OPERATE FROM GROUND CONTROL STATION WITH PERSONNEL IN
THE PLATFORM EXCEPT IN AN EMERGENCY.
– JLG Lift –
1
3121221