SECTION 4 - MACHINE OPERATION

4.12 SHUT DOWN AND PARK

To shut down and park the machine, the procedures are as
follows:
1. Drive machine to a reasonably well protected area.
2. Ensure boom is lowered over rear drive axle.
3. Push in the Emergency Stop at Platform Controls.
4. Push in the Emergency Stop at Ground Controls. Posi-
tion Platform/Ground Select switch to center OFF.
5. If necessary, cover Platform Controls to protect instruc-
tion placards, warning decals and operating controls
from hostile environment.
4-14

4.13 LIFTING AND TIE DOWN

See Figure 4-5. and Figure 4-6.

Lifting

1. Call JLG Industries or weigh the individual unit to find
out the Gross Vehicle Weight.
2. Place the boom in the stowed position with the turntable
locked.
3. Remove all loose items from the machine.
4. Attach lifting device and equipment only to the desig-
nated lifting points.
5. Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
– JLG Lift –
3121141