Engine Operation; Starting Procedure; Shutdown Procedure - JLG 1350SJP Operation And Safety Manual

Boom lifts
Table of Contents

Advertisement

4.4

ENGINE OPERATION

NOTE: Initial starting should always be performed from the
Ground Control station.

Starting Procedure

IF ENGINE FAILS TO START PROMPTLY, DO NOT CRANK FOR AN
EXTENDED TIME. SHOULD ENGINE FAIL TO START AGAIN, ALLOW
STARTER TO "COOL OFF" FOR 2-3 MINUTES. IF ENGINE FAILS AFTER
SEVERAL ATTEMPTS, REFER TO ENGINE MAINTENANCE MANUAL.
NOTE: Diesel engines only: After turning on ignition, operator
must wait until glow plug indicator light goes out before
cranking engine.
1. Turn key of SELECT switch to GROUND. Position
POWER/EMERGENCY STOP switch to ON, then push
the ENGINE START switch until engine starts.
ALLOW ENGINE TO WARM-UP FOR A FEW MINUTES AT LOW SPEED
BEFORE APPLYING ANY LOAD.
2. After engine has had sufficient time to warm up, shut
engine off.
3121141
SECTION 4 - MACHINE OPERATION
3. Turn SELECT switch to PLATFORM.
4. From Platform, pull POWER/EMERGENCY STOP switch
out, then push the ENGINE START switch until engine
starts.
NOTE: Footswitch must be in released (up) position before
starter will operate. If starter operates with footswitch in
the depressed position, DO NOT OPERATE MACHINE.

Shutdown Procedure

IF AN ENGINE MALFUNCTION CAUSES AN UNSCHEDULED SHUTDOWN,
DETERMINE THE CAUSE AND CORRECT IT BEFORE RESTARTING THE
ENGINE.
1. Remove all load and allow engine to operate at low
speed for 3-5 minutes; this allows further reduction of
internal engine temperature.
2. Push POWER/EMERGENCY STOP switch in.
3. Turn MASTER switch to Off.
Refer to Engine Manufacturer's manual for detailed informa-
tion.
– JLG Lift –
4-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1200sjp

Table of Contents