SECTION 4 - MACHINE OPERATION

4.11 SHUT DOWN AND PARK

1. Drive machine to a protected area.
2. Assure main boom is fully retracted and lowered over
rear (Drive) axle; all access panels and doors closed
and secured.
3. Remove all load and allow engine to operate 3-5 min-
utes at LOW setting to permit reduction of engine inter-
nal temperatures.
4. At Ground Controls, turn KEY SELECT switch to (cen-
ter) OFF. Position, POWER/EMERGENCY STOP switch
(down) to OFF. Remove key.
5. Cover Platform Control console to protect instruction
placards, warning decals and operating controls from
hostile environment.
4-14

4.12 TIE DOWN AND LIFTING

The weight of the machine is stamped on the serial num-
ber plate. If the plate is missing or illegible, call JLG Indus-
tries or weigh the individual unit to find out the Gross
Vehicle Weight.
When transporting machine, boom must be in the stowed
mode and machine securely tied down to truck or trailer
deck. Four tie down eyes are provided in the frame slab,
one at each corner of the machine. Lock turntable before
traveling long distances or before hauling machine on a
truck or trailer.
If it becomes necessary to lift the machine using an over-
head or mobile crane, it is very important that the lifting
devices are attached only to the designated lifting area.
(See Figure 4-6 Lifting and Tie Down Decal)
NOTE: Tie down eyes are provided at the front, center, and
rear in the frame slab. Lifting eyes are located in plate
mounted on machine front at boom pivot. (See Figure
4-6 Lifting and Tie Down Decal)
– JLG Lift –
3121216