SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
12. Horizontal and Capacity Limit Switches - Switches
operate properly.
13. Main Hydraulic Pump - See Inspection Note.
2-10
Figure 2-4. Daily Walk-Around Inspection - Sheet 3 of 3
– JLG Lift –
14. Platform Rotator - See Inspection Note.
15. Jib Rotator - See Description.
3121141