Shut Down And Park; Storage Position - JLG 340AJ Operation And Safety Manual

Boom lift
Hide thumbs Also See for 340AJ:
Table of Contents

Advertisement

SECTION 4 - MACHINE OPERATION

4.12 SHUT DOWN AND PARK

Shut Down and Park
See Figure 4-4.
The procedures to shut down and park the machine are as fol-
lows:
1. Drive machine to a reasonably well protected area.
2. Ensure boom is lowered over rear drive axle.
3. Shut down Emergency Stop at Platform Controls.
4. Shut down Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center OFF.
5. If necessary, cover Platform Controls to protect instruction
placards, warning decals, and operating controls from hos-
tile environment.
4-12

Storage Position

(See Figure 4-5.)
The procedure to place the machine in the storage position is as
follows:
1. Place the machine in the stowed position. Refer to Figure 4-
4. From the ground control station, raise the main boom at
least to the elevation shown in Figure 4-5. The main boom
must be raised to prevent the platform basket from hitting
the ground during this procedure.
2. Activate Platform Level Down until the platform is in the
position shown.
THE PLATFORM BASKET MUST NOT BE IN CONTACT WITH THE GROUND, BLOCKING,
OR ANY TIE DOWN EQUIPMENT.
3. Place blocking under the platform support, lower the plat-
form support down onto the blocking by using Main Boom
Lift Down, and tie it down as shown in Figure 4-5.
– JLG Lift –
3121258

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents