General - JLG 1350SJP Operation And Safety Manual

Boom lifts
Table of Contents

Advertisement

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

General

Begin the "Walk-Around Inspection" at Item 1, as noted on
the diagram. Continue to the right (counterclockwise viewed
from top) checking each item in sequence for the conditions
listed in the following checklist.
TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.
DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN
CORRECTED.
INSPECTION NOTE: On all components, make sure there
are no loose or missing parts, that they are securely fas-
tened, and no visible damage, leaks or excessive wear exists
in addition to any other criteria mentioned.
1. Platform Assembly and Gate - Footswitch works prop-
erly, not modified, disabled or blocked. Latch, stop, and
hinges in working condition.
2. Platform & Ground Control Consoles - Switches and
levers return to neutral, decals/placards secure and
legible, control markings legible.
3121141
Figure 2-3. Daily Walk-Around Inspection - Sheet 2 of 3
– JLG Lift –
3. Boom Sections/Uprights/Turntable - See Inspection
Note.
4. Swing Drive - No evidence of damage.
5. Wheel/Tire Assemblies - Properly secured, no missing
lug nuts. Inspect for worn tread, cuts, tears or other dis-
crepancies. Inspect wheels for damage and corrosion.
6. Drive Motor, Brake, and Hub - No evidence of leak-
age.
7. Hood Assemblies - See Inspection Note.
8. Auxiliary Hydraulic Pump - See Inspection Note.
9. All Hydraulic Cylinders - No visible damage; pivot
pins and hydraulic hoses undamaged, not leaking.
10. Turntable Bearing - Evidence of proper lubrication. No
evidence of loose bolts or looseness between bearing
and machine.
11. Steering Spindles and Sensors - See Inspection
Note.
2-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1200sjp

Table of Contents