4.14 Shut Down And Park; 4.15 Machine Lifting And Tie Down; Lifting; Tie Down - JLG E450A Operation And Safety Manual

Boom lift
Table of Contents

Advertisement

SECTION 4 - MACHINE OPERATION

4.14 SHUT DOWN AND PARK

NOTE:
When parking battery powered units overnight, batteries should
be charged in accordance with instructions in Section 2 to
ensure readiness for following workday.
NOTE:
Electric machines are equipped with a static strap due to static
electricity build-ups. Strap is located under rear of machine chas-
sis.
To shut down and park the machine, the procedures are as fol-
lows:
1. Drive machine to a reasonably well protected area.
2. Ensure boom is lowered over rear drive axle.
3. Shut down Emergency Stop at Platform Controls.
4. Shut down Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center Off.
5. If necessary, cover Platform Controls to protect instruction
placards, warning decals and operating controls from hostile
environment.
4-14

4.15 MACHINE LIFTING AND TIE DOWN

See Figure 4-4.

Lifting

1. Refer to the Serial Number Plate, refer to the Specifica-
tions section of this manual, or weigh the individual unit
to find out the Gross Vehicle Weight.
2. Place the boom in the stowed position.
3. Remove all loose items from the machine.
4. Attach lifting device and equipment only to the desig-
nated lifting points.
5. Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.

Tie Down

1. Place the boom in the stowed position.
2. Remove all loose items from the machine.
3. Secure the chassis and the platform using straps or chains of
adequate strength.
– JLG Lift –
3121647

Advertisement

Table of Contents
loading

This manual is also suitable for:

E450ajM450aj

Table of Contents