Installing The Main Transmission Gear - APRILIA RS4 50 2011 Workshop Manual

Table of Contents

Advertisement

RS4 50 MY2011
- Refit the crankcase by warming up the shaft
seats at about 60°C (140°F)
- Tighten the screws to the prescribed torque
- Make sure the crankshaft and the gear work free-
ly after having refitting the crankcase
Recommended products
ENI I-RIDE PG 2T Mixer oil
As an alternative for recommended oils, use top
branded fully synthetic oils that meet or exceed the
ISO - L - EGD, or alternatively JASO FC or API TC
specifications requirements.
Locking torques (N*m)
Crankcase halves fixing screws

INSTALLING THE MAIN TRANSMISSION GEAR

- Insert the key into the hole on the
crankshaft and then install the primary
drive gear
Insert the countershaft of the flywheel
side and make sure that the mechani-
cal timing between the engine pinion
and the countershaft gear is correct.
9 Nm (6.64 lbf ft)
Engine
ENG - 127

Advertisement

Table of Contents
loading

Table of Contents