Yamaha F200B Service Manual page 357

Hide thumbs Also See for F200B:
Table of Contents

Advertisement

Piston ring compressor J: 90890-05158
TIP:
Install the pistons in the original positions.
14. Install the connecting rod caps w to the
connecting rods, and then tighten new
bolts K to the specified torques in 3
stages.
x
Connecting rod bolt K:
1st: 13 N·m (1.3 kgf·m, 9.6 ft·lb)
2nd: 23 N·m (2.3 kgf·m, 17.0 ft·lb)
3rd: 90°
I
J
v
90
y
K
w
TIP:
• Make sure that the protrusions x on the
connecting rod and connecting rod cap w
face toward the flywheel magnet end of the
crankshaft.
• In the 3rd tightening stage for the connect-
ing rod bolts K, mark the connecting rod
bolts and the connecting rod cap with iden-
tification marks y, and then tighten the
bolts 90° from the marks on the connecting
rod caps.
• Make sure that the crankshaft turns
smoothly.
15. Install new gaskets L and the anode
bolts M to the thermostat covers N, and
then tighten the anode bolts to the speci-
fied torque.
16. Install the anodes O to the thermostat
covers N, and then tighten them to the
specified torque.
17. Install new gaskets P to the thermostats
Q, and then install the thermostats to the
cylinder block.
18. Install the thermostat covers N.
19. Install a new gasket R, and then tighten
the thermostat cover plug S to the speci-
fied torque.
Cylinder block
7
7-98

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fl200bF250gFl250g

Table of Contents