Yamaha F200B Service Manual page 269

Hide thumbs Also See for F200B:
Table of Contents

Advertisement

21. Disconnect the shift cut switch coupler
m, and then remove the wiring harness
and neutral switch lead from the holders
J and K.
22. Remove the neutral switch coupler n,
and then disconnect the neutral switch
coupler from the bracket L.
23. Remove the cooling water hose M from
the holder N, and then disconnect the
cooling water hose.
H
m
n
L
N M
24. Remove the holders O, plastic tie P,
and caps Q, and then disconnect the
PTT relay terminals p.
Q
STBD
p
25. Remove the aprons R and cover S.
I
J
K
Q
O
P
O
p
Power unit assembly
S
R
26. Retract the cowling lock levers (PORT
and STBD). NOTICE: Make sure that
the cowling lock levers are retracted
and the engine stoppers are installed
before removing the power unit. Oth-
erwise, the fuel rails could be dam-
aged.
STBD
27. Hook a lifting harnesses to the engine
hangers T, and then suspend the power
unit U.
R
POR
T
7
7-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fl200bF250gFl250g

Table of Contents