Installing the power unit

Before installing the power unit, make sure to
install the shift rod and shift bracket onto the
bottom cowling. See "Shift rod and shift
bracket" (9-1).
Do not reuse a gasket or O-ring, always
replace it with a new one.
1. Retract the cowling lock levers (PORT
and STBD). NOTICE: Make sure that
the cowling lock levers are retracted
and the engine stoppers are installed
before installing the power unit. Oth-
erwise, the fuel rails could be dam-
aged.
7-11
Power unit
T
V
W
W
V
V
X
Y
V
W
STBD
2. Clean the power unit mating surface, and
then the install the dowels 1 and a new
gasket 2.
3. Hook a lifting harness to the engine
hangers 3, and then suspend the power
unit 4.
4. Install the power unit 4, and then tighten
the power unit mounting bolts 5 and 6
to the specified torque.
5
6
6
5
5
1
5
5
6
Power unit mounting bolt 5 and 6:
42 N·m (4.2 kgf·m, 31.0 ft·lb)