Vision Max Pro User Manual page 173

Computerized engraving system
Hide thumbs Also See for Max Pro:
Table of Contents

Advertisement

Maintenance
173
Draining and Refilling the Water Feed System
The water in this system should be drained and refilled approximately every 6 months. To drain the
system, place a bucket under the water level indicator and rotate the indicator counter-clockwise. The
fitting should rotate fairly easily. Do not force the fitting to rotate, although using an open end wrench
and light pressure may be necessary. Allow the system to drain, then rotate the indicator back to vertical
and refill the system with clean water until the water level is at the mid-point of the indicator tube.
Fill the system by rotating the reservoir cover as shown and pouring water in until the proper water level
is reached.
© 2015 Vision Engraving Systems

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents