Monitor Assembly Replacement Procedure - GE LOGIQ 9 Technical Manual

Hide thumbs Also See for LOGIQ 9:
Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2294854-100, R
IRECTION
Section 8-18

Monitor Assembly Replacement Procedure

8-18-1
Manpower
2 persons, 1 hour
8-18-2
Tools
#2 Phillips screwdriver
5 mm Hexagon key
8-18-3
Preparations
1.) Power Off/Shutdown the system as described in
2.) .Remove the Monitor cover: Refer to
a.) Remove the two top screw caps (covers)
b.) Remove the top two screws.
c.) Tilt the back of the monitor up as much as possible and position the back of the monitor over
d.) Using a stubby screwdriver remove the two screws in the bottom of the cover.
8-92
PROPRIETARY TO GE
3
EVISION
Select the movie camera icon to view the video of the monitor
replacement procedure.
6 minutes and 13 seconds
(click here to view the cover removal video)
Figure 8-102 Monitor Cover Top Screws
the top tray well.
Section 8-18 - Monitor Assembly Replacement Procedure
Section 4-3-2 on page
Figure 8-102
and
Figure
LOGIQ™ 9 P
ROPRIETARY
4-3.
8-103.
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents