Siemens SIMATIC FM 353 Manual page 361

Stepper drive positioning module
Hide thumbs Also See for SIMATIC FM 353:
Table of Contents

Advertisement

system data, 9-37
change parameters/data, 9-38
measured values, 9-52
set actual value, 9-48
set actual value on−the−fly, 9-49
set reference point, 9-51
single functions, 9-42 , 9-44
zero offset, 9-46
system data block, 5-8 , 5-26
system of measurement, 9-59
T
Teach in, 9-51
testing (machine axis), 7-7
The POS_CTRL (FC 1) block − data ex-
change, 6-30
The POS_DIAG (FC 2) block − read diagnostic
interrupt data, 6-41
The POS_INIT (FC 0) block− Initialization,
6-30
The POS_MSRM (FC 3) block − read mea-
sured values, 6-25 , 6-41
time-override, 9-5
FM 353 Stepper Drive Positioning Module
6ES7 353-1AH01-8BG0
tool compensation, 10-11
tool offset data, 5-21
Trace, 7-11
traversing block, 9-27
traversing blocks, 10-2
axis as rotary axis, 10-10
block change, 10-4
block structure, 10-2
G functions, 10-3
traversing programs, 5-23 , 9-31
direction of processing, 10-16
input, 5-24
program name, 10-1
program number, 10-1
program structure, 10-2
traversing block, 10-2
traversing blocks, 10-2
U
UL certification, A-1
undo set actual value, 9-46
user data, 8-1
User data block, 6-46
Index
Index-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents