P
7-12
1117539, V
. 07
AGE
ER
2. Once both ends of the Lifting Tray are placed into the cut-out holes, turn the Tray downward.
3. Pull back one of the other ends of the Lifting Tray and align into the groove (refer to illustration
below.).
4. Repeat on other side.
Pull back Tray and
Heat Shield
align into groove
F
7-17: L
T
I
IGURE
IFTING
RAY
NSTALLATION
F
7-18: L
T
I
IGURE
IFTING
RAY
NSTALLED