Wall/Bench Mounting Procedure - Rice Lake IQ plus 310A Installation Manual

Digital weight indicator
Hide thumbs Also See for IQ plus 310A:
Table of Contents

Advertisement

2.9.2 WALL/BENCH MOUNTING PROCEDURE

(1)
Mount the wall/bench mount bracket using appropriate hardware for the installation
surface. Refer to Figure 13 for dimensions of the bracket and mounting holes.
4.83
3.00
0.92
FIGURE 13 – WALL/BENCH MOUNT BRACKET DIMENSIONS
(2)
Peel off the protective paper from the adhesive surface of the two round neoprene
gaskets and press the sticky surface of the gaskets to the inside surfaces of the tilt
stand, centered on the holes needed for the installation (see Figure 14). Bench
installations can use either the upper or lower set of holes; wall installations require
the upper set of holes to provide clearance distance from the wall for wiring access.
(2)
Spread the tilt stand slightly to provide room to slide the indicator between the gaskets.
(4)
While holding the tilt stand spread slightly, place the indicator into the stand.
(5)
Place the sealing washers on the clamp knobs, with the metal side toward the knob.
(6)
Insert the clamp knobs through the the holes in the tilt stand. Screw them loosely into
the indicator body.
(7)
Position the indicator for the desired tilt and tighten the clamp knobs securely.
TOP VIEW
12
0.70
0.265 DIA
Tilt Stand
Clamp Knob
Threaded
Insert
Round
Neoprene
Gasket
FIGURE 14 – WALL/BENCH TILT STAND INSTALLATION
6.00
Sealing Washer
Use upper holes if
mounting on wall
Clamp Knob
Tilt Stand
SIDE VIEW

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents