Polaris IQ 2007 Service Manual page 142

Hide thumbs Also See for IQ 2007:
Table of Contents

Advertisement

4.
Remove the thermostat housing outlet cooling hose from
the housing.
5.
Loosen all, then remove all head cover fasteners. Clean the
fastener threads to remove any thread locking residue.
6.
Discard the head cover and cylinder head o-rings. Always
use new o-rings during assembly.
7.
Inspect the cylinder head / combustion domes for any
damage. Measure cylinder head flatness. Replace cylinder
head if required.
8.
If only the cylinders are going to be removed, remove the
fuel rail from the upper fuel injectors. See "CFI Fuel Rail/
Injector(s) Removal/Installation" on page 4.30.
9.
Loosen all, then remove the cylinder bolts. Clean the bolt
threads to remove any thread locking residue.
10. Carefully pull each cylinder upwards taking care not to
drop the piston and rod abruptly against the crankcase.
11. Remove the cylinder base gaskets. Use a gasket scraper to
clean the gasket residue from the crankcase and cylinder
bases.
12. Inspect the cylinder walls. Nicasil cylinders can only be
lightly honed. Damage that cannot be removed with a light
hone requires cylinder replacement or re-chroming.
13. The assembly process is the reverse of disassembly.
14. Always use new gaskets and o-rings during assembly.
Liberally coat the inside of each cylinder and the outside
of each piston with Polaris two-stroke engine oil.
15. When installing a piston into a cylinder, verify each piston
ring opening is located at each piston ring locating pin.
Squeeze the top ring, then carefully slide the cylinder over
the compressed ring. Do the same with the bottom ring.
16. Follow the torque specifications and torque sequences
located at beginning of chapter when tightening fasteners.
Engine and Cooling Systems
5
5.23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq 2008

Table of Contents