tecan cavro xlp 6000 Operating Manual page 96

Modular syringe pump
Table of Contents

Advertisement

5 - Maintenance
Periodic Maintenance
5.3.2
5.3.3
5 - 4
% Coefficient of Variation = (Standard Deviation/Mean) * 100
n
1
X
n
1
=
i
1
%CV =
X
X
sg
% Accuracy =
Vol
where:
sg = specific gravity of H 2 0 @ 25°C = 0.99707
Vol expected = Expected volume to be dispensed
n = number of replicate
X = individual result
X = mean of all results
Replacing Dispense or Reagent Tubing
To replace dispense or reagent tubing, follow these steps:
1
To remove the tubing, use a 5/16" wrench and gently loosen the fittings.
2
Unscrew the fittings and remove the tubing.
3
To install new tubing, insert the fitting into the valve and tighten it finger tight.
4
Using a 5/16" wrench, turn the fitting another ¼ to ½ turn.
Replacing a Syringe
To replace a syringe, follow these steps:
1
Remove the liquid from the syringe.
2
Remove the plunger lock screw.
3
Lower the plunger drive by sending the [A6000R] command. If power is not
applied, the plunger drive can be manually lowered by pushing down firmly on
the plunger holder assembly.
Cavro® XLP 6000 Modular Syringe Pump Operating Manual, 734237-C, en
2
2
n
X
i
*
100
*
100
100
exp
ected

Advertisement

Table of Contents
loading

Table of Contents