Multi-Stage Hitch Automatic Tail; Swing Tie Rod - Zetor 86 41 forterra turbo Operator's Manual

Table of Contents

Advertisement

MULTI-STAGE HITCH AUTOMATIC
TAIL
For making the connection, pull out the
lock (1) and, at the same time, with the
help of the lever (2) lift the main pin (3)
to the upper position. As soon as the tail
enters the tow bar eye, the pin automati-
cally enters the eye of the trailer to be
attached. After the attachment, make
sure that the lock has snapped back.
The admissible vertical static load is 10
kN.
TRANSPORT APPLICATION
F135

SWING TIE ROD

Transversally, the swing tie rod may be
readjusted to 5 position at 80-mm dis-
tance from each other. In the respective
position, it is locked with a fixing yoke.
Longitudinally, the tie rod may be placed
into 2 positions from the end of the
P.T.O. shaft (350 or 400 mm).
The transverse beam over the tie rod
proper enables the operation with im-
plements requiring a free position of the
tie rod (with the stirrup removed).
The admissible vertical static load on the
fork is 12 kN.
93
F136

Advertisement

Table of Contents
loading

Table of Contents