Installation Checklist; Contents Of This Chapter; Warnings; Checklist - ABB ACS880-07 Hardware Manual

Industrial drives (45 to 630 kw, 50 to 700 hp)
Hide thumbs Also See for ACS880-07:
Table of Contents

Advertisement

Installation checklist

Contents of this chapter

This chapter contains an installation checklist which you must complete before you start up
the drive.

Warnings

WARNING! Obey the instructions in chapter
them, injury or death, or damage to the equipment can occur.

Checklist

Do the steps in section
work. Go through the checklist together with another person..
Check that ...
The ambient operating conditions meet the specifications given in chapter
The drive cabinet has been fixed to floor, and if necessary due to vibration etc, also from top to the
wall or roof.
The cooling air will flow freely in and out of the drive cabinet,
If the drive will be connected to an IT (ungrounded) or a corner grounded TN network: The optional
EMC filter (+E200, +E202) of the drive (if any) has been disconnected. See page 88.
If the drive has been stored over one year: The electrolytic DC capacitors in the DC link of the drive
have been reformed. See Converter module capacitor reforming instructions (3BFE64059629
[English]).
Precautions before electrical work
Installation checklist 135
9
Safety
instructions. If you ignore
on page
16
before you start the
Technical
data.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents