duration of the end signal was set at 60 seconds, whereby the signal is active for 60 seconds
after the program end (remaining time of the signal is displayed in the process screen of the
program generator).
Enter setpoint limits and descriptions
CPU -> Configuration level -> Program generator (> Setpoint limits)
The setpoint values descriptions 1 to 3 are already specified in the process engineering appli-
cation and, if necessary, need to be adapted to the individual plant. Furthermore, the entry limits
(minimum, maximum) of the setpoint values are determined in this dialog.
Select setpoint value for section changeover
CPU -> Configuration level -> Program generator (> Process engineering):
In this example, the setpoint value 3 (T_core) is selected. The value of setpoint value 3 in the
program section is then crucial for the section changeover.