JUMO mTRON T Operating Manual page 41

Measuring, control, and automation system process engineering application
Hide thumbs Also See for mTRON T:
Table of Contents

Advertisement

Alarm list
(1)
(1) Control elements (from left to right):
Acknowledgement (ack)
Back (detailed screen)
2 Process screen operation
(2) Collective alarm in the event list
Tap the symbol to open the event list.
(3) Alarm on: time when the alarm was trig-
gered
Alarm off: time when the alarm stopped (if it
has not yet been acknowledged)
Description (alarm texts of the eight digital
signals of the program generator)
Ack: alarm is still present but it has already
been acknowledged (green check mark)
The bar with the alarm text turns red as
soon as the corresponding alarm goes off.
This remains red until the alarm stops and
has been acknowledged.
(2)
(3)
41

Advertisement

Table of Contents
loading

Table of Contents