3.2 Mechanical Installation

3.2.1 Mechanical Mounting
All Frame Sizes allow side-by-side installation except when a
Design Guide).
If the IP 21 Enclosure kit is used on frame size A1, A2 or A3, there must be a clearance between the drives of a minimum of 2 in [50 mm].
For optimal cooling conditions, allow a free air passage above and below the adjustable frequency drive. See table below.
* FC 301 only
1.
Drill holes in accordance with the measurements given.
2.
You must provide screws suitable for the surface on which you want to mount the adjustable frequency drive. Retighten all four screws.
Table 3.1: When mounting frame sizes A4, A5, B1, B2, C1 andC2 on a non-solid back wall, the drive must be provided with a backplate A to ensure
sufficient cooling air over the heatsink.
IP21/IP4X/ TYPE 1 Enclosure Kit
Air passage for different frame sizes
Frame
A1*
A2
A3
A4
size:
a
100
100
100
100
(mm):
b
100
100
100
100
(mm):
®
MG.33.AG.22 - VLT
is a registered Danfoss trademark
Options and Accessories
is used (see the
A5
B1
B2
B3
B4
100
100
200
100
200
100
100
200
100
200
3 How to Install
section of the
C1
C2
C3
C4
200
225
200
225
200
225
200
225
3-5
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VLT AutomationDrive FC 300 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF