Transport / Shut Down - Animo OptiBean Service Book

Model 2011
Hide thumbs Also See for OptiBean:
Table of Contents

Advertisement

OptiBean /OptiBean XL

7. TRANsPORT / sHUT DOWN

WARNING
Pressurised hot water! Do not remove components
like valves, couplings, plugs and hoses before
depressurise the boiler system.
The drain hose becomes HOT!!
After the boiler has been emptied the pump starts to
pump out water from the tubing!
1. Activate the shut down menu in the service menu
2.14 Installation / shut down and following the
instructions on the display.
2. Close the water supply tap and remove the water
supply hose.
Shut down
Remove
supply hose
Press enter (v)
Stop? Press x
3. There is now no pressure in the boiler. The
shut down menu can be cancelled if necessary.
Follow the menu to empty the complete
water system.
4. Remove the rear wall, remove the drain hose from
the rear plate and remove the drainage plug. Let
the boiler drain into an empty tray (approx. 1.5 litres).
Out of order
Remove
drain plug
Press enter (v)
Stop? Press x
Out of order
Boiler
is empty
switch off
machine
5. The software now knows the water system is empty.
If the unit is reinstalled the commissioning menu will
automatically be activated.
2015/09 Rev. 1.2
Out of order
Boiler
depressurising
Moment please
Out of order
Boiler
draining
Moment please
79
Required equipment and tools:
Crosshead screwdriver
Tray of approx. 1.5 L
EN

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OptiBean and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Optibean xl

Table of Contents

Save PDF