Removing The Cp Carrier Module - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

Removing the CP Carrier Module

Tools Required
#1 Phillips screwdriver with torque capability
Setup
This procedure should be conducted on a static mat.
Wear a wrist strap to ground during the procedure.
Complete these procedures in the following order before performing this procedure:
1. "Removing the Handle" on page 61
2.
3.
4.
5.
6.
CP Module Disassembly
1
Remove the shield by pulling
it upwards over the CP carrier
board.
Note: During reassembly, be
sure to route antenna wires
through slot (red circle) in the
shield. Secure the shield to
the board by aligning with
slots on the board.
9650-0807-01 Rev. C
"Removing the Printer Module" on page 62
"Disassembling the Main Unit" on page 64
"Removing the Display Module" on page 70
"Removing the EtCO2 and NIBP Modules" on page 74
"Removing the Monitor Board and SpO2 Modules" on page 78
Propaq MD Service Manual
Removing the CP Carrier Module
83

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents