Deflation Test - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

22.0 Deflation Test

Dual lumen NIBP hose, stop watch, NIBP simulator
Equipment
Do This...
22.1 From the Propaq NIBP Test control panel,
use the navigation keys to select:
22.2 Monitor the pressure reported by the
NIBP Test control panel or the external
pressure standard, and select Turn Pump
Off as soon as the pressure reaches the
target pressure of 265 +/- 5 mmHg.
22.3 Allow the system to stabilize for 5
seconds.
22.4 Use the navigation keys to select Open
Valve and immediately start the timer.
22.5 Stop the timer as soon as pressure drops
below 15 mmHg.
9650-0807-01 Rev. C
Close Valve
Turn Pump On
ZOLL Propaq MD Service Manual
Observe This...
The pressure should drop within 10
seconds.
Maintenance Tests
Pass/Fail
o o
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents