Before You Begin The Maintenance Tests - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

C
1 M
HAPTER
AINTENANCE
This chapter describes the following maintenance tests:
1.0 Physical Inspection of the Unit
2.0 Operational TestsOperational Tests
3.0 Leads Test
4.0 Heart Rate Display Test
5.0 Heart Rate Alarm Test
6.0 Power Supply Test
7.0 Leakage Current Test
8.0 Shock Test
9.0 Advisory Test
10.0 Synchronized Cardioversion Test
11.0 Pacer Test
12.0 Printer Test
13.0 Treatment Report Test
14.0 SpO2 Test (for SpO
15.0 SpO2, SpCO, and SpMet Test (for SpO
16.0 EtCO2 Calibration (required for annual calibration)
17.0 EtCO2 Calibration Check
18.0 EtCO2 Test
19.0 IBP Test
20.0 NIBP Calibration Check
21.0 NIBP Leak Test
22.0 Deflation Test
23.0 Inflation Test
24.0 NIBP Test
25.0 Temperature Test
26.0 Wi-Fi Test (Optional)

Before You Begin the Maintenance Tests

Assemble the tools listed in following section, "Equipment You Need to Perform the
Keep an extra fully charged SurePower II battery available.
Schedule an hour to conduct the entire maintenance test.
Perform the tests in the order presented.
Perform all the steps of each test procedure.
Complete all the steps of the procedure before evaluating the test results.
6
T
ESTS
feature without SpCO and SpMet)
2
Maintenance Tests."
feature with SpCO, or SpCO and SpMet)
2
9650-0807-01 Rev. C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents