Inflation Test - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

C
1 M
HAPTER
AINTENANCE

23.0 Inflation Test

Dual lumen NIBP hose, stop watch, NIBP simulator
Equipment
Do This...
23.1 Verify that the pressure reported by the
NIBP Test control panel or the external
pressure standard system is less than 5
mmHg.
23.2 From the NIBP Test panel, use the
navigation keys to select Close Valve.
23.3 Select Turn Pump On and immediately
start the timer.
23.4 Stop the timer as soon as pressure exceeds
210 mmHg.
23.5 Select Turn Pump Off, then Open Valve.
23.6 Exit the Service Menu and turn off the
unit.
42
T
ESTS
Observe This...
Verify the time is less than 7
seconds.
Pass/Fail
o o
9650-0807-01 Rev. C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents