Base Station Wiring - Harmony eXLhoist User Manual

Wireless remote control system
Table of Contents

Advertisement

Base Station Wiring

ZARB•W
Wiring procedure:
Step
Action
1
Unscrew the 4 screws at the bottom of the Base Station.
2
Remove the cover and insert a cable gland.
3
Remove the caps.
4
Introduce the cable through the Base Station dedicated hole.
5
Connect the wires in the dedicated connectors.
6
Screw the cable gland.
7
Install the Base Station cover.
8
Screw the 4 screws to fasten the Base Station cover.
ZARB18 terminals:
Insulation:
The group of relays (Q1...Q3), (Q4...Q6), (Q7...Q9), (Q10...Q12) and (Q13...Q18), as well as the
group of inputs (IN0...IN18) and the group of power supply (AC_Phase/+, AC_Neutral/-) respect a
SELV insulation between each other.
A single 240 V insulation shall be respected inside each of the following groups: (AC_Phase/+,
AC_Neutral/-),(Q1...Q3), (Q4...Q6), (Q7...Q9), (Q10...Q12) and (Q13...Q18).
A single 24 V insulation shall be respected inside the (IN0...IN18) group.
EIO0000001505 12/2014
Installation and Wiring
87

Advertisement

Table of Contents
loading

Table of Contents